Client: Bermuda Government Works and Engineering
Project: Environmental Scoping and EIS for the replacement of Longbird and Swing Bridges
Bermuda Environmental Consulting, Ltd. is engaged in undertaking an EIA for the proposed replacement of the Longbird and Swing Bridges.
Client: SOL Petroleum Bermuda Ltd
Project: Environmental Scoping a
Client: Bermuda Government Works and Engineering
Project: Environmental Scoping and EIS for the replacement of Longbird and Swing Bridges
Bermuda Environmental Consulting, Ltd. is engaged in undertaking an EIA for the proposed replacement of the Longbird and Swing Bridges.
Client: SOL Petroleum Bermuda Ltd
Project: Environmental Scoping and EIS for the relocation of the SOL aviation depot at the L.F. Wade International Airport
Bermuda Environmental Consulting, Ltd. is engaged in undertaking an EIA for SOL Petroleum Bermuda Ltd for the proposed re-location of their aviation depot at the L.F. Wade International Airport.
Client: Castile Holdings Ltd
Project: Environmental Scoping and EIS for the Creation of 18 new residential lots for sale to finance the development and Maintenance of Riddell's Bay gardens and Nature reserve. Bermuda Environmental Consulting, Ltd. was engaged to undertake an EIA for the land sub-division of the former Riddell's Bay golf course to accommodate 18 low density residential units as a model for financing the ongoing maintenance of nearly 50 acres of open space and nature reserve.
Client: Saturn Solar Bermuda 1 Ltd
Project: Environmental Scoping and EIS for the a 6MW Utility-Scale Solar PV facility and Interconnection to the Airport (Kindley Field) Substation.
Bermuda Environmental Consulting, Ltd. was engaged to undertake an EIA for the construction and interconnection of Bermuda's first IPP Solar PV facility. Planning approval was granted without objection.
Client: AECON Concessions
Project: Environmental Scoping and EIS for the L.F. Wade terminal redevelopmentBermuda Environmental Consulting, Ltd., in partnership with LAS Int'l Consulting Inc., completed a full Environmental scoping exercise and EIA as part of the Bermuda planning requirements for the proposed re-development of the L.F. Wade terminal redevelopment. Planning approval was granted without objection.
Client: ACBDA - America's Cup
Project: Environmental and Land Use Planning Advisors to the ACBDA in the planning of the AC35 event in Bermuda
Bermuda Environmental Consulting, Ltd. was engaged as the environmental consultant for ACBDA in the planning of the AC35 event village in Dockyard which included preparation of an EIS for the Event Village. Planning approval was granted without objection.
Client: Somers Management Ltd
Project: Environmental Scoping and EIS for the proposed Ariel Sands Hotel and Cottage Colony Development
Bermuda Environmental Consulting, Ltd. completed a full Environmental scoping exercise and EIA as part of the Bermuda planning requirements for the proposed re-development of the Ariel Sands Hotel and Cottage Colony. They also assisted with the DAP1 application. Planning approval was granted without objection.
Client: Bermuda Government
Project: Environmental Scoping and EIS for the proposed upgrades to Bermuda's shipping channels
Bermuda Environmental Consulting, Ltd. undertook a full Environmental scoping exercise and EIA as part of the Bermuda Governments' initiative to upgrade the Island's shipping channels. Planning approval was granted without objection.
Client: C12 Global Investments Ltd
Project: Environmental Scoping for proposed redevelopment of Pink Beach Hotel
Bermuda Environmental Consulting, Ltd. undertook the Environmental scoping as part of the Bermuda planning requirements for G12 Global Investments Ltd for their proposed re-development of the former Pink Beach hotel property.
Client: Sinky Bay Limited
Project: Environmental Scoping and EIS for the development of South Beaches.
Bermuda Environmental Consulting, Ltd. undertook a full Environmental scoping exercise and EIA as part of the Bermuda planning requirements for Sinky Bay Limited for their proposed restaurant, bar, spa, fitness centre, pool and waterspouts facility at the former Sonesta Beach property. Planning approval was granted without objection.
Client: Hamilton Properties Limited
Project: Environmental Scoping and EIS for the development of the Hamilton Princess Hotel Marina, Bar and Grill. Bermuda Environmental Consulting, Ltd. undertook a full Environmental scoping exercise and EIA as part of the Bermuda planning requirements for Hamilton Properties Limited for their proposed 66 berth marina, bar and grill in Hamilton Harbour, inclusive of a Parking Impact Assessment. Planning approval was granted without objection.
Client: Leading Edge Limited
Project: Environmental Scoping for the development of the St. George Boutique Hotel and Marina in the UNESO World Heritage site of St. George's. Bermuda Environmental Consulting, Ltd. prepared an Environmental Scoping Report following wide community stakeholder consultation and marine surveys as part of the Bermuda planning requirements for Leading Edge Limited for their proposed 60 room boutique hotel on Water Street St. George's and 125 berth marina in the harbour.
Client: SOL Petroleum Bermuda Ltd
Project: UST Removal at the L. F. Wade International Airport: Supervision of UST excavation, monitoring and soil sampling for compliance with Bermuda RBCA GuidelinesBermuda Environmental Consulting, Ltd. supervised the removal of 5 former US Navy USTs (2 x 25,000 gallon; 3 x 500 gallon) and undertook moni
Client: SOL Petroleum Bermuda Ltd
Project: UST Removal at the L. F. Wade International Airport: Supervision of UST excavation, monitoring and soil sampling for compliance with Bermuda RBCA GuidelinesBermuda Environmental Consulting, Ltd. supervised the removal of 5 former US Navy USTs (2 x 25,000 gallon; 3 x 500 gallon) and undertook monitoring, soil sampling and reporting in compliance with Bermuda Risk Based Action Limit Guidelines.
Client: Skyport Ltd
Project: Groundwater monitoring at L. F. Wade International Airport
Bermuda Environmental Consulting, Ltd. has been contracted to undertake groundwater monitoring as part of ongoing operational environmental management plan at the L. F. Wade International Airport.
Client: AECON Airport Constructors Ltd
Project: Stormwater, marine water and sediment monitoring at L. F. Wade International Airport
Bermuda Environmental Consulting, Ltd. has been contracted to undertake stormwater, marine water and sediment monitoring as part of the Environmental Monitoring Programme implemented for the construction of the new passenger terminal at the L. F. Wade International Airport.
Client: Gencom
Project: Mould Survey
Bermuda Environmental Consulting, Ltd. was contracted to undertake a mould assessment for Gencom and make appropriate recommendations.
Client: CH2M Hill
Project: Turbidity monitoring of ship's navigational channels. Bermuda Environmental Consulting, Ltd. has been contracted to undertake the turbidity monitoring programme required to ensure regulatory compliance during the dredging works as part of the "Approaches to Bermuda" channel dredging project.
Client: RUBiS Energy Bermuda Ltd
Project: Ongoing groundwater monitoring for RUBiS Energy Bermuda Ltd. Bermuda Environmental Consulting, Ltd. has a contract with RUBiS to undertake groundwater monitoring at their St. George's and Dockyard sites to ensure regulatory compliance, as well as sampling of their Oil Water separators at their retail service stations
Client: Bermuda Hospitals Board
Project: Water Quality Monitoring. Bermuda Environmental Consulting, Ltd. is undertaking regular monitoring and water testing for Bermuda Hospitals Board at MAWI.
Client: Black and McDonald
Project: Monthly monitoring of the Gambro R/O facility servicing the dialysis unit as part of the ongoing operations of the Acute Care Wing of the King Edward VII Memorial Hospital. Bermuda Environmental Consulting, Ltd. is undertaking monthly water testing of the newly installed R/O facility for the dialysis unit of the new Acute Care Wing.
Client: BCM McAlpine Ltd.
Project: Daily monitoring of the Gambro R/O facility servicing the dialysis unit as part of commissioning of the Acute Care Wing of the King Edward VII Memorial Hospital. Bermuda Environmental Consulting, Ltd. is undertaking daily monitoring and monthly water testing during commissioning of the newly installed R/O facility for the dialysis unit of the new Acute Care Wing.
Client: BCM McAlpine Ltd.
Project: Water quality monitoring of sealed hydronic systems required as part of commissioning of the Acute Care Wing of the King Edward VII Memorial Hospital. Bermuda Environmental Consulting, Ltd. is undertaking regular monitoring of the sealed hydronic systems during the commissioning period for the new Acute Care Wing.
Client: Groundwater and Environmental Services Inc.
Project: Ongoing groundwater monitoring, and soil and vapour testing at various sites around Bermuda for SOL Petroleum Bermuda Ltd. Bermuda Environmental Consulting, Ltd. has an ongoing contract with Groundwater and Environmental Services Inc., to undertake groundwater monitoring, product removal, soil and vapour testing at various SOL Petroleum Bermuda Limited sites around Bermuda.
Client: Sinky Bay Ltd.
Project: Assessment of water quality and circulation concerns in Sinky Bay, Bermuda. Bermuda Environmental Consulting, Ltd. is conducting an assessment of the water quality and circulation in Sinky Bay and developing solutions to improve water flow.
Client: Hungry Bay Restoration Committee
Project: Seawall Revetment to Protect Hungry Bay Mangrove. Bermuda Environmental Consulting, Ltd. is volunteering as part of the Hungry Bay Restoration Committee to secure the permits necessary for the construction of a seawall to protect Bermuda's largest mangrove forest.
Client:
AECON Airport C
Client: Hungry Bay Restoration Committee
Project: Seawall Revetment to Protect Hungry Bay Mangrove. Bermuda Environmental Consulting, Ltd. is volunteering as part of the Hungry Bay Restoration Committee to secure the permits necessary for the construction of a seawall to protect Bermuda's largest mangrove forest.
Client:
AECON Airport Constructors Ltd
Project: Marine Ecological Surveys to Satisfy the Requirements for a planning application. Bermuda Environmental Consulting, Ltd. is conducting the marine ecological surveys required as part of a planning application
Client: Bermuda Government
Project: Marine Ecological Surveys to determine best mitigation and/or management action for the dredging of Bermuda's North Channel. Bermuda Environmental Consulting, Ltd. conducted the marine ecological surveys and sediment plumes studies to determine the existing baseline conditions of the marine environment adjacent to the proposed dreading works as part of the "Approaches to Bermuda" project. This work led to improved alignment as well as coral translocation and a turbidity monitoring programme for the project.
Client: Royal Bermuda Yacht Club
Project: Marine Ecological Surveys to Satisfy the Requirements for a planning application. Bermuda Environmental Consulting, Ltd. conducted the marine ecological surveys required as part of a planning application for a dock reinforcement and addition at the Royal Bermuda yacht Club.
Client: Tuckers Point Limited
Project: Ecological Surveys to Satisfy the Requirements of the Special Development Order. Bermuda Environmental Consulting, Ltd. conducted the terrestrial ecological surveys required for this SDO, including habitat mapping, mapping of all endemic and signature native and ornamental plants and trees, skink and endemic snail surveys, land impact analyses and recommendations for mitigation and/or to minimise the impacts of development.
Client: OBMIProject: Ecological Study of Dock Structures. Bermuda Environmental Consulting, Ltd. conducted a survey of dock structures around the island to guide the design of a private dock structure that sought to minimise the environmental impacts.
Project: Skink Survey of Castle Point. Bermuda Environmental Consulting, Ltd. conducted a skink survey by trapping at Castle Point in order to guide construction and the landscaping design and layout for the Castle Point property.
Client: Corporation of Hamilton
Project: Marine Ecology Study. Bermuda Environmental Consulting, Ltd., undertook a baseline ecological survey of Hamilton Harbour as part of the requirement for the Corporation of Hamilton to fulfill an EIA for their proposed Waterfront Development.
Client: Bermuda Government Department of Conservation Services
Project: Population Assessment of the Bermuda Skink on Horn Rock. Bermuda Environmental Consulting, Ltd worked with the Department of Conservation Services to supervise the design and implementation of a population estimate of the population of the endangered, endemic Bermuda Rock Lizard, Eumeces longirostris on Horn Rock.
Client: SOL Petroleum Bermuda Ltd
Project: Development of Construction Environmental Management Plan for the construction of the proposed new aviation depot at the L. F. Wade International Airport.Bermuda Environmental Consulting, Ltd. worked with the site developers and regulatory authorities to develop the Environmental Management Plan
Client: SOL Petroleum Bermuda Ltd
Project: Development of Construction Environmental Management Plan for the construction of the proposed new aviation depot at the L. F. Wade International Airport.Bermuda Environmental Consulting, Ltd. worked with the site developers and regulatory authorities to develop the Environmental Management Plan for construction of this facility.
Client: Saturn Solar Bermuda 1 Ltd
Project: Development of Construction Environmental Management Plan for the construction of a 6 MW Utility-Scale Solar PV facility.Bermuda Environmental Consulting, Ltd. worked with the site developers and regulatory authorities to develop the Environmental Management Plan for construction of this facility.
Client: ACBDA
Project: Development of Sediment monitoring plan and contingency plan design and Construction Environmental Management Plan (CEMP). Bermuda Environmental Consulting, Ltd. worked with the site developers and regulatory authorities to develop the Environmental Management Plan for construction and the Conservation Management Plan for the South Basin landfill to support the 35th America's Cup event. We also prepared the incident management file.
Client: Sinky Bay Limited
Project: Environmental monitoring design and development of Construction Environmental Management Plan (CEMP) as well as Conservation Management Plan. Bermuda Environmental Consulting, Ltd. worked with the site developers and regulatory authorities to develop the Environmental Management Plan for construction and the Conservation Management Plan for this restaurant, bar, spa, fitness centre, pool and waterspouts facility and prepared their Incident Management File.
Client: Hamilton Properties Limited
Project: Environmental monitoring design and development of Marina Environmental Management Plan and Construction Management Plan as well as Panic Prevention Plan. Bermuda Environmental Consulting, Ltd. worked with the marina developers and regulatory authorities to develop the Environmental Management Plans for both construction and ongoing operations for this 66-berth marina, bar and grill and prepared their Incident Management Files.
Client: Stocks Harbour Marina
Project: Environmental monitoring design and development of Marina Panic Prevention Plan. Bermuda Environmental Consulting, Ltd. worked with the marina developers and regulatory authorities to develop appropriate monitoring plans for this 200-berth marina and prepared their Emergency Panic Prevention Plan.
Client: North Rock Marina
Project: Environmental monitoring design and development of Marina Environmental Management Plan. Bermuda Environmental Consulting, Ltd. worked with the marina developers and regulatory authorities to develop their Marina Environmental Management Plan and Emergency Panic Prevention Plan.
Client: Bermuda National Trust
Project: Woodland Management Plan for Nature Reserve. Bermuda Environmental Consulting, Ltd. is working with the BNT to develop a Woodland Management Plan for one of their nature reserves.
Client: Bermuda Environmental Sustainability Task Force
Project: Organise and facilitate workshop entitled: Environmental Impact Assessment - An Essential Tool. Bermuda Environmental Consulting, Ltd. organised and facilitated a CPD workshop for local architects, environmentalists, planners and engineers on the EIA process.
Client: Bermuda
Client: Bermuda Environmental Sustainability Task Force
Project: Organise and facilitate workshop entitled: Environmental Impact Assessment - An Essential Tool. Bermuda Environmental Consulting, Ltd. organised and facilitated a CPD workshop for local architects, environmentalists, planners and engineers on the EIA process.
Client: Bermuda National Trust
Project: Development of Climate Change Educational materials. Bermuda Environmental Consulting, Ltd. worked with the Bermuda National Trust and Aspen Insurance Holdings Ltd to develop educational materials detailing the local impacts of climate change and possible adaptation measures.
Client: Bermuda Government
Project: Expert Evidence for Hamilton Waterfront development. Bermuda Environmental Consulting, Ltd. reviewed the project documents to assess the lease valuation of the proposed development area for the Hamilton Waterfront development as well as the regulatory framework in which such a development would have bee
Client: Bermuda Government
Project: Expert Evidence for Hamilton Waterfront development. Bermuda Environmental Consulting, Ltd. reviewed the project documents to assess the lease valuation of the proposed development area for the Hamilton Waterfront development as well as the regulatory framework in which such a development would have been considered.
Client: Bermuda Environmental Sustainability Task Force
Project: Expert Evidence for Development Objection. Bermuda Environmental Consulting, Ltd. reviewed the development application for a proposed beach bar on Warwick Long Bay and provided a submission of expert opinion for legal proceedings.
Copyright © 2022 Bermuda Environmental Consulting, Ltd - All Rights Reserved.
Powered by GoDaddy